CityStore Dunstable

PROJECT DESCRIPTION

Date:
Location: Dunstable
Door colour: Solent Blue
Door frame colour: White

The goal set by CityStore for this project was to install a 2-tier mezzanine floor to maximize the NLA (Net Lettable Area). We were able to achieve this by utilizing the roof voids and using the gaps in the centre of the roof trusses for the corridor.

SCOPE OF WORKS
  • 2-tier mezzanine supply and installation
  • suspended tile fire ceiling
  • column cases
  • staircases and stair enclosures
  • soffit panels
  • electrics
  • sliding doors installation
  • chequer plate corner guards
  • propeller plate and chequer plate kicker guards
  • chequer plate wall guards

CUSTOMERS SAY

CityStore has built an excellent relationship with Kuboid over many years. Our very first project together was a very large underground car park in Camden, this presented many challenges for us and was definitely not a ‘normal’ construction. The combined team of CityStore & Kuboid really had our work cut out trying to find solutions to several issues, not the least controlling water ingress from the heating system for the flats above. We achieved it and have now every project since seems so much easier. The quality of the Kuboid product and installation is second to none.

Paul Johnson
Construction Director, CityStore